Kiva.Dang/VNRE - On the golden land of Thu Duc District with area of 28,168.7 m2, the Song Da Riverside Apartment Complex was planned as a five-star residential because it is surrounded by water and trees, and plenty of public works. Density of construction is only 5,802 m2, occupied a plot of 20.6%, the land area for green and water up to 7,980.7 m2, the remaining land area for traffic internal and external.
Location
- Located at 623, Highway 13th, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City.
- The northwest borders the Saigon River.
- The south-east borders Highway 13th.
- The southwest and northeastern borders existing residential area, so very convenient for traffic as well as the waterway linking the provinces of East and Southwest.
- With 2 surface is contigous to the Saigon River and Lo Duong cannal, Songda Riverside should be in a healthy climate, the romantic landscape, surrounded by low-rise villas and tree.
- Position on National Highway 13th which is connected between two key economic sector Binh Duong and Hochiminh City.
Scale
Song Da Riverside has five 25-storey towers (not including the ground floor, mezzanine and roof) as the shape of five apricot blossom petals spreading out five way and the pistil is the vast central square. Looking down from on high the whole project as a giant apricot flower reflected down the romantic Saigon River, as a peaceful and romantic paiting.
Under five towers are two basements thoroughly (which has a floating basement) with a total area of 32.199m2 for parking. Besides 1,248 apartments with area from 75 to 121m2, penthouse with the area from 175m2 or more, each tower also has private public service, trade. Specifically, An Vui 1 tower has six floors for business, the entire ground floor of the three towers An Vui 2, 4 and 5 is the commercial center, ground floor of An Vui 3 tower with a total area of 1,252m2 will be used for kindergarten. The entire roof of the building' sole will be arranged for park, trees, playgrounds, walking street.
Around the towers are flower garden, water landscape. Existing Lo Duong cannal will be renovated, bending river routes into the landscape river and ecology lake. This lake will be connected with marina on the Saigon River to meet the transportation needs. As transportation planning, from this marina can go to Vung Tau Province and the Mekong River Delta or to the beach along the country. It is also difference highlight in design showed planning vision of the investors.
Legal and project progress
Until now, all legal procedures, the clearance the ground, survey design and construction of auxiliary works were completed. Embankment system of reinforced concrete has been completed in March 2010. Expected in late 2010, Song Da Riverside will be officially starting construction.
For further information, please contact:
Location
- Located at 623, Highway 13th, Hiep Binh Phuoc Ward, Thu Duc District, Ho Chi Minh City.
- The northwest borders the Saigon River.
- The south-east borders Highway 13th.
- The southwest and northeastern borders existing residential area, so very convenient for traffic as well as the waterway linking the provinces of East and Southwest.
- With 2 surface is contigous to the Saigon River and Lo Duong cannal, Songda Riverside should be in a healthy climate, the romantic landscape, surrounded by low-rise villas and tree.
- Position on National Highway 13th which is connected between two key economic sector Binh Duong and Hochiminh City.
Scale
Song Da Riverside has five 25-storey towers (not including the ground floor, mezzanine and roof) as the shape of five apricot blossom petals spreading out five way and the pistil is the vast central square. Looking down from on high the whole project as a giant apricot flower reflected down the romantic Saigon River, as a peaceful and romantic paiting.
Under five towers are two basements thoroughly (which has a floating basement) with a total area of 32.199m2 for parking. Besides 1,248 apartments with area from 75 to 121m2, penthouse with the area from 175m2 or more, each tower also has private public service, trade. Specifically, An Vui 1 tower has six floors for business, the entire ground floor of the three towers An Vui 2, 4 and 5 is the commercial center, ground floor of An Vui 3 tower with a total area of 1,252m2 will be used for kindergarten. The entire roof of the building' sole will be arranged for park, trees, playgrounds, walking street.
Around the towers are flower garden, water landscape. Existing Lo Duong cannal will be renovated, bending river routes into the landscape river and ecology lake. This lake will be connected with marina on the Saigon River to meet the transportation needs. As transportation planning, from this marina can go to Vung Tau Province and the Mekong River Delta or to the beach along the country. It is also difference highlight in design showed planning vision of the investors.
Legal and project progress
Until now, all legal procedures, the clearance the ground, survey design and construction of auxiliary works were completed. Embankment system of reinforced concrete has been completed in March 2010. Expected in late 2010, Song Da Riverside will be officially starting construction.
For further information, please contact:
Song Da Invest & Development JSC
Add: 14 Ky Dong Street, Ward 9, District 3, HCMC
Tel: 84.8.3843 8504 - Fax: 84.8.3843 8504
Add: 14 Ky Dong Street, Ward 9, District 3, HCMC
Tel: 84.8.3843 8504 - Fax: 84.8.3843 8504
Post a Comment
Post a Comment